Use este identificador para citar ou linkar para este item: https://repositorio.ifgoiano.edu.br/handle/prefix/6070
Tipo: Trabalho de Conclusão de Curso
Título: ANÁLISE TÉCNICA DE SUBESTAÇÃO ELÉTRICA: UM ESTUDO COMPARATIVO ENTRE O PROJETO TÉCNICO E A INSTALAÇÃO EXECUTADA
Título(s) alternativo(s): TECHNICAL ANALYSIS OF AN ELECTRICAL SUBSTATION: a comparative study between the technical design and the executed installation.
Autor(es): Silva, Kleyton de Olanda Melo; Melo, Kayo Divino Ribeiro
Primeiro Orientador: Bonuti, Robert de Souza
Primeiro Membro da Banca: Ganzaroli, Cleber Asmar
Segundo Membro da Banca: Araujo, Roberto Bessa de
Resumo: A estabilidade do fornecimento de energia elétrica em estabelecimentos assistenciais de saúde, constitui requisito fundamental para a segurança de pacientes e a preservação de equipamentos de alta tecnologia. Este estudo de caso analisa a implantação de uma subestação abrigada de 15 kV em ambiente hospitalar, com foco no dimensionamento, na proteção e na seletividade do sistema. A metodologia compreende o levantamento da carga instalada, a especificação técnica de transformadores e condutores, bem como o cálculo dos níveis de curto-circuito para a definição dos parâmetros de ajuste dos relés, conforme diretrizes da NBR. A investigação confronta o projeto técnico dimensionado academicamente com a instalação efetivamente executada, identificando discrepâncias entre o rigor normativo e a realidade operacional. Os resultados apontam vulnerabilidades no sistema de proteção e desvios técnicos que comprometem a coordenação seletiva. As conclusões indicam a necessidade de adequações nos ajustes dos dispositivos de proteção e propõem melhorias na infraestrutura para mitigar riscos de desligamentos indevidos, assegurando a confiabilidade e a continuidade do serviço essenciais à atividade hospitalar.
Abstract: The stability of the electrical power supply in healthcare facilities is a fundamental requirement for patient safety and the preservation of high-technology equipment. This case study analyzes the implementation of a 15 kV enclosed substation in a hospital environment, focusing on the sizing, protection, and selectivity of the system. The methodology includes surveying the installed load, specifying the technical specifications of transformers and conductors, and calculating short-circuit levels to define the relay adjustment parameters, according to NBR guidelines. The investigation compares the academically designed technical project with the installation actually implemented, identifying discrepancies between normative rigor and operational reality. The results point to vulnerabilities in the protection system and technical deviations that compromise selective coordination. The conclusions indicate the need for adjustments in the settings of the protection devices and propose improvements in the infrastructure to mitigate the risks of unintended shutdowns, ensuring the reliability and continuity of service essential to hospital activity.
Palavras-chave: Infraestrutura Hospitalar
Equipamentos
Proteção
Coordenação
Seletividade
Hospital Infrastructure
Equipment
Protection
Coordination
Selectivity
Área do CNPq: ENGENHARIAS::ENGENHARIA ELETRICA::SISTEMAS ELETRICOS DE POTENCIA::TRANSMISSAO DA ENERGIA ELETRICA, DISTRIBUICAO DA ENERGIA ELETRICA
Idioma: por
Pais: Brasil
Editor: Instituto Federal Goiano
Sigla da Instituição: IF Goiano
Campus: Campus Trindade
Tipo de Acesso: Acesso Aberto
URI: https://repositorio.ifgoiano.edu.br/handle/prefix/6070
Data do documento: 11-Dez-2025
Aparece nas coleções:Bacharelado em Engenharia Elétrica

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
TCC_Kleyton Olanda_Kayo Divino.pdf3,46 MBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.