Please use this identifier to cite or link to this item: https://repositorio.ifgoiano.edu.br/handle/prefix/909
metadata.dc.type: Trabalho de Conclusão de Curso
Title: ESTUDO DE CASO: COMPARATIVO DE CUSTOS ENTRE PROJETOS ESTRUTURAIS E ANÁLISE DO SEU IMPACTO NO ORÇAMENTO FINAL DA OBRA
Other Titles: Case study: Comparison of costs between structural projects and analysis of their impact on the final budget of the work
metadata.dc.creator: Borba, Natalia Marques de Freitas
metadata.dc.contributor.advisor1: Sales, Marcel Willian Reis
metadata.dc.contributor.advisor-co1: Santos, Mateus Souza
metadata.dc.contributor.referee1: Costa, Denner Ferreira
metadata.dc.contributor.referee2: Ferreira, Diego Borja
metadata.dc.description.resumo: O orçamento é uma ferramenta de suma importância na verificação da viabilidade financeira de um empreendimento, através do qual é possível avaliar se os métodos construtivos adotados estão compatíveis com os recursos disponíveis para a execução do empreendimento. Visto que a concepção estrutural está diretamente relacionada ao custo de execução, esse trabalho propõe analisar o impacto de dois projetos de estruturas de concreto armado, ambos concebidos no software Eberick, no orçamento final de uma edificação residencial. Com a elaboração de planilhas orçamentárias e elementos gráficos, realizou-se comparativos de custo dos projetos com o orçamento da obra por meio dos quais é possível concluir que a concepção estrutural adotada no ato do projeto apresenta grande impacto financeiro na execução de obras, podendo elevar os custos e causar prejuízos as empresas.
Abstract: The budget is an extremely important tool in verifying the financial viability of an enterprise, through which it is possible to assess whether the construction methods adopted are compatible with the resources available for the execution of the enterprise. Since the structural design is directly related to the cost of execution, this work proposes to analyze the impact of two projects of reinforced concrete structures, both designed in the Eberick software, on the final budget of a residential building. With the elaboration of budget spreadsheets and graphic elements, comparisons were made between the cost of the projects and the budget of the work, through which it is possible to conclude that the structural concept adopted in the act of the project has a great financial impact on the execution of works, and may increase costs and cause losses to companies.
Keywords: Concepção estrutural. Estrutura de concreto. Viabilidade financeira.
Structural design. Concrete structure. Financial viability.
metadata.dc.subject.cnpq: ENGENHARIAS::ENGENHARIA CIVIL
metadata.dc.language: por
metadata.dc.publisher.country: Brasil
Publisher: Instituto Federal Goiano
metadata.dc.publisher.initials: IF Goiano
metadata.dc.publisher.department: Campus Rio Verde
metadata.dc.rights: Acesso Aberto
URI: https://repositorio.ifgoiano.edu.br/handle/prefix/909
Issue Date: 30-Jan-2020
Appears in Collections:Bacharelado em Engenharia Civil

Files in This Item:
File Description SizeFormat 
tcc_Natalia Marques de Freitas Borba.pdf2,18 MBAdobe PDFView/Open
TCAE Natalia.pdf623,74 kBAdobe PDFView/Open
ATA de defesa Natalia.pdf443,78 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.