Use este identificador para citar ou linkar para este item:
https://repositorio.ifgoiano.edu.br/handle/prefix/6040| Tipo: | Trabalho de Conclusão de Curso |
| Título: | AVALIAÇÃO DA CONFORMIDADE TÉCNICA DE UMA SUBESTAÇÃO DE EXTRA ALTA TENSÃO SEGUNDO A NR-10, NBR 5419-3 E O SUBMÓDULO 2.6 DO ONS: um estudo de caso |
| Título(s) alternativo(s): | TECHNICAL COMPLIANCE ASSESSMENT OF AN EXTRA HIGH VOLTAGE SUBSTATION ACCORDING TO NR-10, NBR 5419-3, AND ONS SUBMODULE 2.6: a case study |
| Autor(es): | Siqueira Neto, Altair Garcia de |
| Primeiro Orientador: | Stecanella, Priscilla Araújo Juá |
| Resumo: | A operação segura e padronizada das subestações de alta tensão é importante para garantir a confiabilidade do Sistema Interligado Nacional (SIN), uma vez que inadequações técnicas podem comprometer a estabilidade operativa, aumentar riscos de falhas e afetar a continuidade do fornecimento de energia. Nesse contexto, torna-se importante avaliar se as instalações atendem aos requisitos normativos que asseguram desempenho adequado, segurança aos operadores e integridade dos equipamentos. Este trabalho apresenta a aplicação do Submódulo 2.6 dos Procedimentos de Rede do Operador Nacional do Sistema Elétrico (ONS) na avaliação da conformidade técnica de uma subestação de extra alta tensão pertencente à Rede Básica, tomando como estudo de caso uma subestação abaixadora de 230 kV. Além das exigências do Submódulo 2.6, também foram verificadas as distâncias mínimas de segurança previstas na NR-10 e a conformidade da proteção contra descargas atmosféricas conforme a NBR 5419-3. A metodologia adotada compreende o levantamento e a análise sistemática dos projetos as built, memoriais descritivos, folhas de dados e documentos complementares, comparando-os com requisitos normativos específicos referentes ao arranjo de barramento, corrente em regime permanente, capacidade de curto-circuito, coordenação de isolamento, unidade transformadora de potência, disjuntores, chaves seccionadoras e para-raios. Os resultados evidenciam itens plenamente conformes e que atendem às exigências específicas do ONS, destacando a importância da verificação pré-operacional como instrumento para assegurar a padronização, a segurança e o desempenho confiável das instalações conectadas ao SIN. O estudo demonstra que a aplicação estruturada dos requisitos normativos contribui para a mitigação de riscos operacionais, para o correto dimensionamento dos equipamentos. |
| Abstract: | The safe and standardized operation of high-voltage substations is essential to ensuring the reliability of the Brazilian Interconnected Power System (SIN), since technical inadequacies may compromise operational stability, increase the likelihood of failures, and affect the continuity of electricity supply. In this context, assessing whether installations comply with the regulatory requirements that ensure adequate performance, operator safety, and equipment integrity becomes particularly important. This study presents the application of Submodule 2.6 of the Grid Procedures of the National System Operator (ONS) in the technical compliance assessment of a high-voltage substation belonging to the Basic Network, using as a case study a 230 kV step-down substation. In addition to the requirements of Submodule 2.6, the minimum safety distances established by NR-10 and the conformity of the lightning protection system according to NBR 5419-3 were also verified. The methodology includes the systematic review of as-built design documents, descriptive reports, datasheets, and complementary technical records, comparing them with specific normative requirements regarding busbar arrangement, continuous current capacity, short-circuit withstand capability, insulation coordination, power transformer unit, circuit breakers, disconnect switches, and surge arresters. The results indicate full compliance with ONS requirements, highlighting the importance of pre-operational verification as a tool to ensure standardization, safety, and reliable performance of facilities connected to the SIN. The study demonstrates that the structured application of regulatory criteria contributes to mitigating operational risks and ensuring proper equipment sizing. |
| Palavras-chave: | ONS conformidade técnica subestações de alta tensão submódulo 2.6 procedimentos de rede |
| Área do CNPq: | ENGENHARIAS::ENGENHARIA ELETRICA ENGENHARIAS::ENGENHARIA ELETRICA::SISTEMAS ELETRICOS DE POTENCIA ENGENHARIAS::ENGENHARIA ELETRICA::SISTEMAS ELETRICOS DE POTENCIA::TRANSMISSAO DA ENERGIA ELETRICA, DISTRIBUICAO DA ENERGIA ELETRICA ENGENHARIAS::ENGENHARIA ELETRICA::SISTEMAS ELETRICOS DE POTENCIA::INSTALACOES ELETRICAS PREDIAIS E INDUSTRIAIS |
| Idioma: | por |
| Pais: | Brasil |
| Editor: | Instituto Federal Goiano |
| Sigla da Instituição: | IF Goiano |
| Campus: | Campus Trindade |
| Tipo de Acesso: | Acesso Aberto |
| URI: | https://repositorio.ifgoiano.edu.br/handle/prefix/6040 |
| Data do documento: | 8-Dez-2025 |
| Aparece nas coleções: | Bacharelado em Engenharia Elétrica |
Arquivos associados a este item:
| Arquivo | Descrição | Tamanho | Formato | |
|---|---|---|---|---|
| TCC_DEFINITIVO_CORRIGIDO_CFICHA.pdf | 11,2 MB | Adobe PDF | Visualizar/Abrir |
Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.